ROOFING — REMOTE ESTIMATOR STARTER PACK Estimators.io | October 26, 2026 1. FIRST-WEEK CHECKLIST Day 1: Confirm role, scope, region, time zone, software access and named reviewer. Record drawing/specification revisions and document permissions. Day 2: Read roof plans, sections, roof assembly schedules, details and specifications. Write a scope map and questions log before measuring. Day 3: Record roof zones, slopes and measurement basis. Separate field covering, insulation, underlay, flashings, perimeter, drains and penetrations. Show whether quantities are plan areas or slope-adjusted areas. Day 4: Add quoted or approved pricing, source dates, labour basis, assumptions and exclusions. Review Confirm tear-off, disposal, substrate repairs, access, temporary weather protection, warranty requirements and existing-condition allowances. Do not price an unseen deck repair as a confirmed quantity. Day 5: Check area basis, perimeter and penetration counts, and compare each assembly to the specification and supplier quote. 2. SAMPLE ASSIGNMENT A two-zone roof with different assemblies, several penetrations and one revised parapet detail. Use a training set or authorised redacted drawings. Submit marked plans, a quantity workbook, assumptions, exclusions, RFIs and a revision summary. No invented rates or client claims. 3. SCOPE CHECKLIST Document/revision | Included assembly or system | Quantity basis | Drawing reference | Interface owner | Exclusion | Open question | Reviewer Record roof zones, slopes and measurement basis. Separate field covering, insulation, underlay, flashings, perimeter, drains and penetrations. Show whether quantities are plan areas or slope-adjusted areas. Scope risks: Confirm tear-off, disposal, substrate repairs, access, temporary weather protection, warranty requirements and existing-condition allowances. Do not price an unseen deck repair as a confirmed quantity. 4. ESTIMATE REVIEW TEMPLATE Project code: Estimator / reviewer: Trade / work package: Documents and addenda checked: Units and measurement method: Quantity reconciliation: Rate source / quote date / expiry: Labour and productivity basis: Waste and allowances: Interfaces, inclusions and exclusions: Open RFIs / owner / deadline: Change from prior issue: Reviewer findings / corrections: Authorised issue date and status: ADMISSION Relevant past experience -> EyeSpyR review -> Estimators.io experience review -> approved registration -> trade onboarding. A supplied reference or checklist is not completed verification. Do not include ID documents or confidential client drawings in a public sample.