ELECTRICAL — REMOTE ESTIMATOR STARTER PACK Estimators.io | October 26, 2026 1. FIRST-WEEK CHECKLIST Day 1: Confirm role, scope, region, time zone, software access and named reviewer. Record drawing/specification revisions and document permissions. Day 2: Read electrical plans, legends, panel schedules, single-line diagrams and specifications. Write a scope map and questions log before measuring. Day 3: Count devices by type and location. Identify measured versus assumed routing. Separate distribution equipment, raceways, cabling, terminations and installation labour with traceable worksheet references. Day 4: Add quoted or approved pricing, source dates, labour basis, assumptions and exclusions. Review Confirm utility interfaces, low-voltage scope, controls, fire alarm, testing, commissioning and temporary power. Missing routes or circuit information must remain visible questions. Day 5: Reconcile device counts to schedules, identify equipment exclusions, and review routing assumptions with an experienced electrical estimator. 2. SAMPLE ASSIGNMENT A tenant floor with device layouts, a panel schedule and one lighting revision. Use a training set or authorised redacted drawings. Submit marked plans, a quantity workbook, assumptions, exclusions, RFIs and a revision summary. No invented rates or client claims. 3. SCOPE CHECKLIST Document/revision | Included assembly or system | Quantity basis | Drawing reference | Interface owner | Exclusion | Open question | Reviewer Count devices by type and location. Identify measured versus assumed routing. Separate distribution equipment, raceways, cabling, terminations and installation labour with traceable worksheet references. Scope risks: Confirm utility interfaces, low-voltage scope, controls, fire alarm, testing, commissioning and temporary power. Missing routes or circuit information must remain visible questions. 4. ESTIMATE REVIEW TEMPLATE Project code: Estimator / reviewer: Trade / work package: Documents and addenda checked: Units and measurement method: Quantity reconciliation: Rate source / quote date / expiry: Labour and productivity basis: Waste and allowances: Interfaces, inclusions and exclusions: Open RFIs / owner / deadline: Change from prior issue: Reviewer findings / corrections: Authorised issue date and status: ADMISSION Relevant past experience -> EyeSpyR review -> Estimators.io experience review -> approved registration -> trade onboarding. A supplied reference or checklist is not completed verification. Do not include ID documents or confidential client drawings in a public sample.