DRYWALL FINISHING — REMOTE ESTIMATOR STARTER PACK Estimators.io | October 26, 2026 1. FIRST-WEEK CHECKLIST Day 1: Confirm role, scope, region, time zone, software access and named reviewer. Record drawing/specification revisions and document permissions. Day 2: Read wall schedules, elevations, ceiling plans and finish specifications. Write a scope map and questions log before measuring. Day 3: Separate finishing by specified level and substrate. Identify ceilings, high walls, corners, control joints and repairs independently. State the measurement basis and keep painting outside scope unless expressly included. Day 4: Add quoted or approved pricing, source dates, labour basis, assumptions and exclusions. Review Confirm surface condition, protection, lighting expectations, access, sanding and responsibility for correction work. Do not assume every existing wall needs the same preparation. Day 5: Reconcile areas to the assemblies, check corner and joint quantities and confirm the boundary between boarding, finishing and painting. 2. SAMPLE ASSIGNMENT An office finishing package with two finish levels, a high wall and a revised corner condition. Use a training set or authorised redacted drawings. Submit marked plans, a quantity workbook, assumptions, exclusions, RFIs and a revision summary. No invented rates or client claims. 3. SCOPE CHECKLIST Document/revision | Included assembly or system | Quantity basis | Drawing reference | Interface owner | Exclusion | Open question | Reviewer Separate finishing by specified level and substrate. Identify ceilings, high walls, corners, control joints and repairs independently. State the measurement basis and keep painting outside scope unless expressly included. Scope risks: Confirm surface condition, protection, lighting expectations, access, sanding and responsibility for correction work. Do not assume every existing wall needs the same preparation. 4. ESTIMATE REVIEW TEMPLATE Project code: Estimator / reviewer: Trade / work package: Documents and addenda checked: Units and measurement method: Quantity reconciliation: Rate source / quote date / expiry: Labour and productivity basis: Waste and allowances: Interfaces, inclusions and exclusions: Open RFIs / owner / deadline: Change from prior issue: Reviewer findings / corrections: Authorised issue date and status: ADMISSION Relevant past experience -> EyeSpyR review -> Estimators.io experience review -> approved registration -> trade onboarding. A supplied reference or checklist is not completed verification. Do not include ID documents or confidential client drawings in a public sample.