DEMOLITION — REMOTE ESTIMATOR STARTER PACK Estimators.io | October 26, 2026 1. FIRST-WEEK CHECKLIST Day 1: Confirm role, scope, region, time zone, software access and named reviewer. Record drawing/specification revisions and document permissions. Day 2: Read demolition plans, existing-condition records, surveys and specifications. Write a scope map and questions log before measuring. Day 3: Separate removal quantities by material and location. Mark retained elements, protection zones, salvage and disposal streams. Record what has and has not been observed. Day 4: Add quoted or approved pricing, source dates, labour basis, assumptions and exclusions. Review Clarify hazardous-material surveys, isolations, temporary support, occupancy, dust controls and disposal requirements with the responsible specialists. Unknown hazards must not be priced as confirmed ordinary waste. Day 5: Check demolition against retained work, review access and protection, and list survey or isolation information still needed. 2. SAMPLE ASSIGNMENT A selective strip-out with retained partitions, separate disposal streams and one revised removal boundary. Use a training set or authorised redacted drawings. Submit marked plans, a quantity workbook, assumptions, exclusions, RFIs and a revision summary. No invented rates or client claims. 3. SCOPE CHECKLIST Document/revision | Included assembly or system | Quantity basis | Drawing reference | Interface owner | Exclusion | Open question | Reviewer Separate removal quantities by material and location. Mark retained elements, protection zones, salvage and disposal streams. Record what has and has not been observed. Scope risks: Clarify hazardous-material surveys, isolations, temporary support, occupancy, dust controls and disposal requirements with the responsible specialists. Unknown hazards must not be priced as confirmed ordinary waste. 4. ESTIMATE REVIEW TEMPLATE Project code: Estimator / reviewer: Trade / work package: Documents and addenda checked: Units and measurement method: Quantity reconciliation: Rate source / quote date / expiry: Labour and productivity basis: Waste and allowances: Interfaces, inclusions and exclusions: Open RFIs / owner / deadline: Change from prior issue: Reviewer findings / corrections: Authorised issue date and status: ADMISSION Relevant past experience -> EyeSpyR review -> Estimators.io experience review -> approved registration -> trade onboarding. A supplied reference or checklist is not completed verification. Do not include ID documents or confidential client drawings in a public sample.